bobthedinosaur wrote:nice picasso
Thanks bob
[Dramatic Break]
[Break dramatic Break, its too long, drama is broken]
Behold, the CentrAIl ConstructionTrain.
Right now WIP think- the Rails Picasso, how is it going to drive, and the answer is, the Rails have always been there, hidden in the ground, popin up, right in front of the train, forming Rails of pure energy.
How is it going to turn Picasso, WIP is mumbling, we dont have snakeunits, followin one another without LUA, and i say, it has no need to turn, or to return. Its a oneway Construction Unit, it centers on the constructionsite, drives there, and is in the building process dissolved. But what if it is not needed, if it goes back on the track to drone-depot? Well, it is a mirrored Unit, so we-are-usin-the-train-dont-forget-your-flashdrive-dont-forget-your-flashdrive :) :) :)